Shariati Combined Cycle Power Plant cooling system, EPC

Client Ministry of Energy
MAPNA
Project Cooling system, Shariati Combined cycle power plant, EPC
Location Mashad
Contract Period 16 months

Project objectives

The EPC contract for implementation of the Mashad power plant was signed with a consortium composed of BSS, Tosse Silooha and Asfalt Toos. The contract period from engineering stage up to commissioning was 16 month and started from 1380/4/23. The completion percentage at 1381/5/23 which was end of month 13, was 97% and on 1382/1/11 the power plant was synchronized. The cooling system together with other sections was handed over on 1382/6/5. The cooling tower is dry type Heller system and is concrete. The tower height is 112 meters and the tower diameter at the ground level is 74 m.

The project quantities:

Excavation 15,000 m3
Reinforcement 2100 tones
Formworks 9,000 m2
Sliding formwork 29000 m2
Concrete 8000 m3

The supply of the main equipment including condenser and the storage tanks as well design, shop design and prefabrication and installation were done by BSS.