Yazd combined cycle power plant cooling system, EPC

Client Ministry of Energy
Iran power plant projects management Co. (MAPNA)
Project Yazd combined cycle power plant, cooling system.
Location Yazd
Contract Period 24 months

Project objectives

The project is the cooling system of Yazd combined cycle power plant. This EPC project was awarded to the Joint Venture of BSS/Norahan Sanayeh for engineering, procurement and construction. The contract period, from the engineering stage up to commissioning is 24 month. The tower is 135 meter high and the diameter at the ground level is 100 meters.

Assignment of the Joint Venture:

All the stage of the project including engineering, site engineering, supply of local and imported equipment, construction of the concrete tower, prefabrication and assembling, installation and commissioning will be carried out by the Joint Venture.